Rural Community Buttstädt – preservation order compliant renovation of town hall

The west wing renovation of Buttstädt’s town hall is one of the projects currently funded by ERDF Thuringia. In the process, the preservation of historic building stock is of utmost importance. The impressive, renaissance style building, which is listed as “historic”, is located at the market square, right in the city centre. Once the renovation works are completed, the west wing will host a medical centre. The primary concern is to provide the inhabitants of Buttstädt with accessible medical care in the heart of the town. Thus, the town centre becomes busier and more colourful, whilst, at the same time, urban infrastructure and quality of life are being enhanced.

Construction site at City Hall. An excavator and several rubble containers are surrounded by a site fence.
The construction site at City Hall. An excavator and several bulk containers are surrounded by a site fence.
Gable wall of the Buttstaedter town hall with a bell tower and an obelisk
The gable wall of the Buttstädter town hall with a bell tower and an obelisk.
Bell tower of the Buttstadt town hall. This one sits on a red roof with small windows. An alarm siren is mounted in a corner
A close-up of the bell tower of the Buttstädt town hall. This one sits on a red roof with small windows. An alarm siren is mounted in a corner.
In the foreground is a stone sculpture of an angel with golden wings. In the background the town hall of Buttstädt
In the foreground is a stone sculpture of an angel with golden wings. In the background the town hall of Buttstädt
 Panoramic shot of the Buttstadt town hall
A panoramic shot of the Buttstädt town hall
Buttstädt town hall
View of the Buttstädt town hall
floor plan of the Buttstädt town hall
Plan of the floor plan of the Buttstädt town hall
Buttstädter town hall and church
View of the Buttstädter town hall and the church
Operation name
2019 SBZ 0306
Name of category of intervention
055 - other social infrastructure contributing to regional and local development
Operation start date
01.03.2018
Operation end date
31.12.2022
Total eligible expenditure allocated to the operation
2.093.468,54
Union co-financing rate
80 %
Operation postcode
99628
Country
Germany